Case studies
Case studies
Real performance data from Thermova installs across Lancashire, Blackpool and the Fylde Coast. Measured kWh, SCOP and CO₂ — not "up to" claims.
Latest
Installs we can talk about by the numbers.
-
Case studyBest Solar Panels 2026: Brand Comparison Guide for Lancashire Homeowners | Thermova
Best solar panels, inverters and batteries for 2026 UK installs. Honest brand comparison from Blackpool solar installer Thermova: JA Solar, REC, AIKO, Tesla, Fox ESS & more.
-
Case studyHow Much Do Solar Panels Cost in Blackpool & Lancashire in 2026? Real Prices Explained | Thermova
Real 2026 solar panel prices from Blackpool solar installer Thermova. 4 kWp £7k, 6 kWp £9.5k, 8 kWp £12k — with battery add-ons, payback maths & 0% VAT until March 2027.
-
Case studyHeat Pump vs New Gas Boiler 2026: 10-Year Cost & Carbon Comparison | Thermova
Should you replace your gas boiler in 2026 — or switch to a heat pump? Full 10-year cost, carbon and bill comparison for Lancashire homes from Thermova.
-
Case studyEPC C by 2030: What Lancashire Landlords Need to Know About MEES, Heat Pumps & Solar | Thermova
UK Government confirmed January 2026: all rental properties need EPC C by October 2030, £10k cost cap. Lancashire landlord guide to MEES compliance with heat pumps and solar.
-
Case studyAir Source Heat Pump Case Study: Fleetwood Bungalow Goes From EPC E to C | Thermova
Real Thermova air source heat pump install in Fleetwood, Lancashire. Full radiator system, EPC E to C, £7,500 Boiler Upgrade Scheme grant applied. Costs less than a boiler swap.
-
Case studySolar Panels & Battery Storage Case Study: Cleveleys Family Cuts Grid Imports 72% | Thermova
Real Thermova solar and battery install data from Cleveleys, Lancashire. 6.4 kWp PV + 10 kWh battery, 5,420 kWh generated, 1 tonne CO₂ saved, 2-day install.
-
Case studyAir Source Heat Pump Case Study: How a Lytham Edwardian Semi Cut Heating CO₂ by 75%
Real Thermova air source heat pump install data from Lytham, Lancashire. Measured SCOP 3.8, 11,940 kWh saved, 2.2 tonnes CO₂ cut, 3-day install. Free survey.